The easiest and cheapest time to alter the information system is in theâ ________ phase.

a. system definition

b. implementation

c. requirements analysis

d. component design

e. system maintenance

Respuesta :

fireflies854 fireflies854
  • 04-04-2018
d or c hope this helps

Answer Link

Otras preguntas

What does "I have a soul of lead" mean in shakespeare?
how do you work out linear equation word problems
Which ratio is the odd one out? 5:30 2:12 7:41 1:6 10:60
A gallon of latex paint can cover 300 square feet. Felix has a pentagonal room in which all the sides have the same lenth of 10 feet thr room has a 8 foot celin
Thirty is 12% of what number ?
If a 3 kg object has a momentum of 33 kg ms whats its velocity?
What can government do to reduce unemployment?
list the layers of the sun in order from the innermost to the outermost.
what is the answer to Jody has a rectangular piece of fabric 7/8 yard long and 4/5 wide. what's the area of the fabric? and Jody shares a piece with her friend
Jay simplified the expression 3×(3+12÷3)-4.For his first step,he added 3+12 to get 15. What was Jay's error?Find the correct answer