Beverly7520 Beverly7520
  • 01-03-2018
  • Social Studies
contestada

In the lean principles philosophy, unexpected downtime is the result of unreliable processes.

a. True

b. False

Respuesta :

Grace0424
Grace0424 Grace0424
  • 01-03-2018
I thinks the answer is true
Answer Link

Otras preguntas

The significance of the Pequot war of 1637 was that:
given the following formula, solve for t. v=u+at
When Amy states, "We feel that better aligning our talent strategy with our business strategy is going to be critical for our success" which of the four basic m
Yesterday's afternoon temperature was 21°F. It plunged overnight to -3°F. How many degrees did the temperature drop?
9–5(x+4)=3(2–x) help!!!!!1
For which purpose would a thematic map be most appropriate?
is a notary public required to purchase an error and ommission policy
(Actually answer please<3) Using the vertical line test: Use the vertical line test to determine if the graph is a function or not a function A. Function not
Modern neuroscience has found that once we pass adolescence, the human brain is no longer plastic. True False
------i need help now PLZ 3 questions------