RoboticNaruto4693 RoboticNaruto4693
  • 03-01-2018
  • Physics
contestada

How much work is done when a hoist lifts a 290-kg rock to a height of 7 m?

Respuesta :

samuraijack
samuraijack samuraijack
  • 03-01-2018
Given: Mass m = 290 Kg;  Height  h = 7 m

Required: Work = ?

Formula: Work = Force x distance  but, Force F = mg

W= fd

W = mgh

W= (290 Kg)(9.8 m/s²)(7 m)

W = 19,894 Kg.m²/s²

W = 19,894  J




  
Answer Link

Otras preguntas

Which word describes the behavior of a system that undergoes changes and returns to its previous conditions on regular timing?
please help and explain question b​
Twelve more than a number is nine.
The failure to deliver blood to the heart due to a narrowing of arteries results in __________.A.atherosclerosisB.a strokeC.coronary heart diseaseD.hypertension
What mass of a 4.00 % NaOH solution by mass contains 15.0 g of NaOH?
23. What does the term expense mean?
Which type of water balance disorder would be caused by renal failure? a. Dehydration b. Water intoxication c. Volume excess d. Hypovolemia
Calculate the mean and the standard deviation of the following set of data: 4.578 g, 4.581 g, 4.572 g, 4.573 g, 4.601 g, 4.577 g. State the 68% and 95% confiden
A base class named Garden contains a private field width and a property public int Width that contains get and set accessors. A child class named VegetableGarde
What part of 35 is 7?