mparrish2965 mparrish2965
  • 03-07-2022
  • Engineering
contestada

A feature control frame must be connected to

Respuesta :

tcs1257621
tcs1257621 tcs1257621
  • 03-07-2022

Answer:

Surface Parallelism When a surface is to be parallel to a datum plane, the feature control frame is connected by a leader to the surface, or to an extension line from the surface.

Explanation:

Answer Link

Otras preguntas

the ratio in fraction of 2.5/8 to 8. 3/4 as a fraction in simplest form
Which professions best characterize the jobs held by people in the middle class at the turn of the twentieth century?
if an area is 120 square feet. the width is 5/6 of the lenght. what are the dimensions
The universal sign for choking is __________. a. two balled fists pressing the abdomen b. pointing at an open mouth c. two hands grasping the neck d. pretending
You have 59 total coins for a total of $12.05. You only have quarters and dimes. How many of each coin do you have?
does anybody know the theme of "the lottery"
y = 5sin (2x) + 4 What's the amplitude, period, phase shift, and vertical shift?
Convert 2,750 ml to liters.
What movement did Muhammed Ali Jinnah lead? a. He wanted a separate Hindu state. c. He wanted a separate deomcratic state. b. He wanted a separate Muslim state.
Tunis is a free port in Morocco.