hannahgrace31511 hannahgrace31511
  • 03-11-2021
  • Mathematics
contestada

A chef can finish a catering job in 4hr. His student can do the same job in 12hr. How long will it take them both to do the job if they work together

Respuesta :

shayy1616 shayy1616
  • 03-11-2021
12 divided by 4 equal 3
Ans:3hrs
Answer Link

Otras preguntas

A 1700 kg 2006 Mustang GT can accelerate from rest to 100 km/h in a time of 5.0 s.  Determine the net amount of work that must be done on the car to cause this
1. Why are there active volcanoes along the Pacific coast in Washington and Oregon but not along the East coast of the United States?
Any number that is divisible by 3 is also divisible by 9.Find a counterexample to show that the conjecture is false.18274548
2(n-3)=4n+1 this sucks not knowing the answer
all fractions between 0 and 1/4
a person who studies word origins and meanings would most likely be a
A construction contractor is purchasing granite tiles for a new kitchen floor. Each tile costs $5 and he wants to spend less than $1,500. The size of each tile
What is the difference between displacement and double displacement reactions?Write equations for these reactions?
I = {1, 2} List all possible subsets of the given set.
Consider the following system of equations. y = 2x - 2 y - 2x = 5 What can you conclude about the system of equations? The system of equations is inconsistent.