krishnashrrstha41
krishnashrrstha41 krishnashrrstha41
  • 04-08-2021
  • Mathematics
contestada

15men can complete a piece of work in25days. how many men should be added to complete the same work in15days.​

Respuesta :

mhanifa
mhanifa mhanifa
  • 04-08-2021

Answer:

  • 10 men

Step-by-step explanation:

Amount of work done by 15 men is:

  • 15 men *25 day = 15*25 man*days

Same work can be done by 25 men, in 15 days, so 10 more men should be added.

Answer Link
abovejosh
abovejosh abovejosh
  • 04-08-2021
Answer: 10 men explanation: guy above me
Answer Link

Otras preguntas

what is cube root of 711
A 200m x 80m field produces 4800kg of harvest. How mcuh harvest will be produced by a 190m x 90m field?
Which of the following describes the Urban League? A. formed in response to race riots in 1908 B. focused on helping poor African American workers C. helped mid
What is true about the variable x when the variable n is a negative number?
How does a stars mass affect its life cycle
In June 1987, President Ronald Reagan made the "Remarks at Brandenberg Gate, Berlin, Germany". Describe the impact of this speech and discuss how this affected
how to write 0.326 in 2 different ways
Which image marks the shift in the speaker's mood in "The Rainy Day"? A. "Behind the clouds the sun is shining" B. "My thoughts still cling to the moldering
a wind turbine primarily uses which type of energy
What is the best estimate for the length of a bike