Mr. Kumar is getting his house renovated. 1/5 th of the work has been completed in 2 months. How much time will it take for the entire work to be completed?

Respuesta :

liam2747
liam2747 liam2747
  • 02-05-2021

Answer:

10 months

Step-by-step explanation:

If it takes 2 months to do 1/5th, it will take 4 months to do 2/5, 6 months to do 3/5, 8 months to do 4/5, and 10 months to do 5/5 or in other words the whole thing.

Answer Link

Otras preguntas

Explain why the temperature of distilled water is kept at 37°C ?​
For a scene in a movie, a stunt driver drives a 1700 kg pickup truck with a length of 4.45 m around a circular curve with a radius 0f 0.355 km. The truck is to
Select the correct answer. Which equation represents the vertical line passing through (1,-9)? A. x = -9 B. x = 1 C. y = -9 D. y = 1
(Auto-Graded) Wkbk Ex. 8-10 Así se forma: The preterit of irregular verbs8-10 Tus amigos y tú fueron a pasar el día a Chicago. Completa la narración con formas
Son los pantalones de tu papá? Si, son ________
How did diseases affect the construction of the Panama canal?
name this wound. thank you
HELPP PLEASEEE ASAPP!!!
Please help with this problem
PLEASE ANSWER ASAP! Which table shows a proportional relationship between x and y? A,x 3 6 8 10 y 12 15 18 20 B,x 1 2 7 8 y 0.5 1 3.5 4 C,x 3 7.5 15 20 y 1 2.5