ddrain550 ddrain550
  • 02-04-2021
  • Physics
contestada

How much work is done on 10.0 c of charge to move it through a potential diffrence of 9.0 v in 10.0s

Respuesta :

pytvaeh123
pytvaeh123 pytvaeh123
  • 02-04-2021
We need more evidence to be provided
Answer Link

Otras preguntas

Point V is on line segment UW. Given VW = 6 and UV = 12, determine the length UW.
Help, please!3x−y=12 x=−6y−15 What is the solution? Show work!
Trapezoid PQRS is resized by a scale factor of ​​​​​​​ 3/2 about the origin and then translated 2 units left into the trapezoid P'Q'R'S'. Enter the coordinates
Will 2/5+√3 be rational or irrational? Why? A. The answer would be rational. An irrational number plus an irrational number is always rational. B. The answer wo
Pa solve naman with solution please loadan ko ng 20 ang maka sagot yung tama sana ​
Suppose f(x)=−2x^2+x−2 . Compute the following:
What three native group in Sc belong to the Eastern Woodland Tribes?
A common denominator for 6 and 8 is Please help, for 13 points :) (if u answer JUST for the points then i will report)
what are the first 50 decimal numbers in pie 3.14159265 Then what?
What is the slope of the line that passes through the points (-2,7) and (2,-5)