maaf34nb8f maaf34nb8f
  • 01-04-2021
  • Engineering
contestada

A short framing member that fills the space
between the rough sill and the soleplate is a

Respuesta :

iBear25k
iBear25k iBear25k
  • 01-04-2021

A short framing member that fills the space between the rough sill and the soleplate is a cripple stud.

(HAVE A GOOD DAY!!!)

Answer Link

Otras preguntas

Find angle picture below
PLZ HELP WILL GIVE BRAINLIEST
Algebraic expressions describe a ________________. They can be as simple as a number, or they can include a ________________ of numbers, variables, and symbols.
Find the total of a 1560 meal with 15% tip and 8% tax.
Cosx=4/5 what is sin2x cos2x and tan2x
Determine whether the expression is a polynomial. If it is a polynomial state the degree of the polynomial 3z^2 - 5z + 11
A 2.0-kilogram ball traveling north at 4.0 meters per second collides head on with a 1.0-kilogram ball traveling south at 8.0 meters per second. What is the mag
An average, how many eggs does a female release each cycle?
Aubrey has a new art box in the shape of a rectangular rectangular prism. The box is 12 cm space, by 20cm, 5 cm the only thing in the art box is a new pink eras
Please help meWhich of the following is not a reason to understand the relational stages?A. to identify the stages of your relationshipsB. to correct problems i