medm0om5iebernan medm0om5iebernan
  • 01-11-2016
  • Mathematics
contestada

A construction company delivered 40 loads of concrete in 5 days.

What was their rate of work?



A.




B.




C.




D.


Respuesta :

melhunt99
melhunt99 melhunt99
  • 05-11-2016
Well 40 divided by 5 is 8 and you don't have options so I would say 8 loads a day :)
Answer Link

Otras preguntas

What is the measure of an angle that is eight times its supplement?
A high school soccer goalie blocked the ball from going into the goal 4 out of 5 times. If the ball kicked toward the goal 25 times,how many blocks did the goal
what is activation engery
Grace is in the car with her mother. they drive by a cow in a pasture, and grace says "horse." this is an example of:
A year is a leap year if it is divisible by 4. but if the year is divisible by 100, it is a leap year only when it is also divisible by 400.
Find the sum of the geometric sequence. (1 point) 1, 1/2, 1/4, 1/8, 1/16
The term that refers to how often you exercise
the length of the diagonal of a square prism with a base edge length of 12 in. and a height of 1 in.
What are two fungi skin infections that humans can contract
The amount of energy exerted during physical activity is known as the __________ of the activity.