raazshah661 raazshah661
  • 03-09-2020
  • Mathematics
contestada

A can do a piece of work in 20 days and B can do it in 12 days,B work for 9 days,in how many days A alone can do the work​

Respuesta :

roseheart889 roseheart889
  • 03-09-2020

Answer: 9

Step-by-step explanation:

Answer Link

Otras preguntas

In the aftermath of World War II, what happened to the U.S. economy? A) A contraction led to a recession. B) There was a major sustained expansion. C) It gra
how was the muslim society structured
Which of the following is a true statement about credit? Using a credit card is the same as cash. Credit cards are less convenient than carrying cash. Havin
lofty means: O balmy radiant remote elevated PROGRESS: 100 POINTS
The cost of a camp is $300 for the first week and $125 for each week beyond the first. The total cost can be modeled by the expression 300 + 125(x – 1). What do
what caused the need for direct democracy to the people
Evaluate the title of the novella. Why did Camus choose The Stranger? Is it an effective title for this work?. Your answer should be at least one hundred words.
Which form of Greek literature was popular with medieval readers? A. Military conquests B. allegory C. Mythology D. Tragedy
How is Madeline a tortured character in the house of usher
Which statement is true about a person on Mars? A. A person would have the same mass, but weigh less. B. A person would have less mass, and weigh less. C. A per